120149 - Cinder removing facility
ITEM NAME: Cinder removing facility
Kit includes a gantry crane, 2 heated swivel water spouts (DB NW 200), 2 slag hoppers, 1 ground plate (344 mm) with slag pit, rolling slag carriage, and bucket.
Above the slag pit the ground plate is provided with two driving rails.
It can be connected to all types of tracks, even those with middle conductor, except Märklin’s C track.
Combining two inspection pits (120136) allows to build a two-track deslagging plant with a parallel track distance of 67 mm, matching that of the bunker (120148).
Such an installation allows the gantry crane to span 3 tracks – 2 slag pits and 1 track for slag wagons.
Above the slag pit the ground plate is provided with two driving rails.
It can be connected to all types of tracks, even those with middle conductor, except Märklin’s C track.
Combining two inspection pits (120136) allows to build a two-track deslagging plant with a parallel track distance of 67 mm, matching that of the bunker (120148).
Such an installation allows the gantry crane to span 3 tracks – 2 slag pits and 1 track for slag wagons.
This building kit contains:
69 single parts in 2 colours and 1 construction instruction.
Use for handicrafts FALLER - plastic glue.
69 single parts in 2 colours and 1 construction instruction.
Use for handicrafts FALLER - plastic glue.
ITEM REF: PRICE (USD) PRICE (EUR) PRICE (CHF)
120149 63,22 48,99 61,65
120149 63,22 48,99 61,65